Planning & Design: Existing building (built circa 1889)  Re-Adaptive Use of existing silk factory building into a steel manufacturing company, and new building addition for administrative offices with high performance & efficiency HVAC for I
       
     
BIM LOD-200
       
     
 Planning & Design: Existing building (built circa 1889)  Re-Adaptive Use of existing silk factory building into a steel manufacturing company, and new building addition for administrative offices with high performance & efficiency HVAC for I
       
     

Planning & Design: Existing building (built circa 1889) Re-Adaptive Use of existing silk factory building into a steel manufacturing company, and new building addition for administrative offices with high performance & efficiency HVAC for Interior Air Quality (IAQ).

Client: Lecapife Corp.
Status: Master plan
Location: Paterson, NJ
Sector: Industrial Manufacturing

BIM LOD-200
       
     
BIM LOD-200

Design development studies for Zoning Infill, site planning, and building systems. The two facts to proposed this new cantilever addition building was the Paterson, NJ Flood Hazard and Parking Requirements of this city district.